Works are progressing on site following the Christmas break.

With the piling works complete the piling mattress is now being removed and replaced with a load transfer platform.  Construction of the pad foundation will follow.

16-Jan-2014-(14)rev 16-Jan-2014-(3)

 

 

 

 

 

Groundworks are ongoing with material being excavated for the pools.